GT105N10K
The GT105N10K is a MOSFET manufactured by GOFORD, supplied in a TO-252-3, DPak (2 Leads + Tab), SC-63 package.
Specifications
| Category Name | MOSFETs |
|---|---|
| Operating Temperature | -55°C ~ 150°C (TJ) |
| Package/Case | TO-252-3, DPak (2 Leads + Tab), SC-63 |
| Mounting Type | Surface Mount |
| Manufacturer | GOFORD |
| Current-Continuous Drain (Id) @25°C | 60A (Tc) |
| Input Capacitance (Ciss) (Max) @ Vds | 1574 pF @ 50 V |
| Drain to Source Voltage (Vdss) | 100 V |
Manufacturer Part Number: GT105N10K · Package: TO-252-3, DPak (2 Leads + Tab), SC-63
Typical Applications & Selection Notes
Used for switching and power control in motor drivers, supplies and load boards. Check gate drive and thermal limits against your layout before committing to the GT105N10K.
Related Parts
Related parts in the same category. Compatibility depends on your design — confirm specs and pinout before substituting.
Sourcing Notes
Genuine supply
The GT105N10K is sourced through verified channels with authenticity checks. Tell us your quantity and we will confirm stock and origin.
Pricing & lead time
We reply with a USD unit price, MOQ and current lead time. Paste a full BOM if you are pricing more than one part.
Need an alternative?
If the GT105N10K is allocated or discontinued, send us your spec and we will suggest cross-referenced parts with confirmed availability.
Frequently Asked Questions
What is the GT105N10K?
The GT105N10K is a MOSFET manufactured by GOFORD, supplied in a TO-252-3, DPak (2 Leads + Tab), SC-63 package.
Who manufactures the GT105N10K?
The GT105N10K is made by GOFORD.
What package does the GT105N10K come in?
It is supplied in a TO-252-3, DPak (2 Leads + Tab), SC-63 package.
What are the key specs of the GT105N10K?
Key parameters include Category Name: MOSFETs. See the full table above for all 8 specifications.
Are there alternatives to the GT105N10K?
Yes. Related parts in the same category include IRF3315PBF-VB, AUFS4410Z-VB, FCI7N60, K2926-VB. Contact us to confirm pin compatibility and availability.
Can I get a quote and lead time for the GT105N10K?
Yes. Submit an RFQ with your required quantity and we will reply with USD pricing, stock and lead time, typically within one business hour.
Need this part or a full BOM quote?
Paste your part numbers, quantity and target price — a Huaqibei trader will reply with USD pricing, stock and lead time.
Request a Quote →